Case Studies

Toads Hole Valley

FSL Projects Ltd supported the Development Manager with quantity surveying services for the redevelopment of 186 acres of land including associated highway works for a mixed use development in Brighton.

With such a sizeable development, securing realistic costs for infrastructure enhancements is always an issue. However, with close liaison with the appointed energy consultant we were able to determine realistic enhancement costs for the scheme.

Overall, the cost planning met with the clients requirements which enabled them to determine their future exit strategy for the development.